The Massachusetts Department of Transportation (MassDOT) is announcing that the New Bedford-Fairhaven swing bridge (Route 6) is currently closed due to heat impacts. This closure is expected to remain in place for several hours.*
Drivers traveling through the affected area should expect delays, reduce speed, and use caution.
For more information on traffic conditions, travelers are encouraged to:
- Download the Mass511 mobile app or visit www.mass511.com to view live cameras, travel times, real-time traffic conditions, and project information before setting out on the road. Users can subscribe to receive text and email alerts for traffic conditions.
- Dial 511 and select a route to hear real-time conditions.
- Follow @MassDOT on X (formerly known as Twitter) to receive regular updates on road and traffic conditions.
*Editor’s note: The closure has lasted for a number of days and may happen again if temperatures rise above 90.
•••
Click here to download the 6/26/25 issue: 06-26-25 FhvnPride
Support local journalism, donate to the Neighb News with PayPal



