Fairhaven Zoning Board of Appeals
The Fairhaven Board of Appeals will hold a Public Hearing on Tuesday, August 1, 2017 at 6:00 PM in the Town Hall to consider the following petition(s):
NEW PUBLIC HEARINGS:
1. Petitioner Joaquin Resendes Breese, RE: 50 Bayview Avenue, Plot 28A, Lot 441, Book 11962 and Page 097. 198-18: Short 14’ of required 20’ front setback and 3’ short of required 10’ side yard (north side) all within an RA District.
2. Petitioner: Jeremiah E. & Diane E. Foster, RE: 18 Cherry Street, Plot 13, Lot 8A, Book 8288 and Page 87. 198-18: Short 1’ of required 10’ side yard in an RA District.
3. Petitioner: Keith Silvia, RE: 33 Little Neck Road, Plot 43A, Lot 231. Special Permit required for placement of camper on lot.
4. Petitioner: Lisa Medeiros, RE: 36 Newbury Avenue, Plot 19, Lot 103-105, 115 & 122, 113 & 114, Book 1832, 1552 & 1666 and Page 830, 397 & 802. 198-18: Lot 1 short 7,350 sq. ft. of required 15,000 sq. ft.; Lot 2 short 7,780 sq. ft. of required 15,000 sq. ft. Taking one non-conforming lot and creating 2 non-conforming lots.
5. Petitioner: David Tomasia, RE: 15 Grinnel Street, Plot 31A, Lot 97, Book 8962 and Page 345. 198-22– A1-A2: 1,028 sq. ft. over max allowed of 700 sq. ft., 5’ over max height of 20’ for accessory buildings.
6. Petitioner: Robert & Judith Tubbs, RE: 294 Huttleston Avenue, Plot 31B, Lot 60B, Book 9524 and Page 174. 198-18: Short 70’ of required 200’ frontage, short 72,233 sq. ft. of required 100.000 sq. ft., short 5’ of required 50’ rear setback, short 42,233 sq. ft. of required 70,000 sq. ft. of contiguous upland and 19% over max lot coverage of 50% all within an RC District.
7. Petitioner: Thomas Peterman, RE: 191 Main Street, Plot 14, Lot 23, Book 137 & 175 and Page 59 & 34. 198-16: Special Permit required for a museum within an RA District.
8. Petitioner: Chad & Claudia Pompella, RE: 177 Ebony Street, Plot 43B, Lot 312, Page 24015. 198-18: Short 25’ of required 30’ rear yard and 16% over max building coverage all within an RR District.
Peter DeTerra, Chairman
7/20/17,7/27/17
Click here to download the entire 7/20/17 issue: 07-20-17 MondayFun
Click here to download the letter from Algonquin Gas about withdrawing the AccessNE Project: 06-30-17 letter_LNGWithdrawn